LØVSETH+PARTNERE | Tjuvholmen Bridge

Tjuvholmen Bridge

Client: Tjuvholmen utbygging

Project status: Draft 2005

 

Draft of bridge across the dock between Aker Brygge and Tjuvholmen. The bridge`s glass was meant to be illuminated with data-controlled LED.